- Plant for cooling water in Atyrau refinery (Kazakhstan) – outdoor instalations, electro installations for power supply in production facility, oil separator and pump stations with cooling towers, Investor "Kazstroyservice" OGCC JSC and "EPS" LLP
- Main design of Catodic protection on project Increase of the capacity of the gas pipeline Kazakhstan-China (first section), investor "Asia gas pipeline" LLP, Kazakhstan
- Electrical Conceptual Design documentations for Photovoltaic Solar Power Plant installed power 5 MWp, investor „Elektroprivreda Srbije“
- General Design with Prefeasibility Study for wind farm installed power 30MW, investor „Elektroprivreda Srbije“
- Main design for Photovoltaic Solar Power Plant „Svilajnac“ installed power 945kWp, investor IEL OIE Exploitation SV;
- Main design for Photovoltaic Solar Power Plant „Horgoš“ installed power 2,1MWp, investor „Severna solarna elektrana“;
- Main design for Photovoltaic Solar Power Plant „ERS Trebinje“ installed power 6,76kWp, investor „Elektroprivreda Republike Srpske“,
- Electrical Conceptual Designs for Photovoltaic Solar Power Plants on roofs total installed power more than 0,5MWp
- Electrical Main Design documentations for adaptation of Lightning and Earthing Protection Systems for met masts;
- General Design with Prefeasibility Study for Photovoltaic Solar Power Plant „Horgoš“ installed power 2,1MWp in Horgos;
- Energy Efficiency Studies for Higher and Basic Courts around Serbia: Higher Court in Vranje, Basic Court and Higher in Nise, Basic Court and Higher in Pirot, Basic Court in Užice, investor The Ministry of Foreign Affairs of the Kingdom of Norway and International Management Group (IMG)
- Electrical Main Design documentations for Telekom Serbia offices and Points of Sale
- More then two hundred Electrical Main Design documentations for telecommunication facilities for mobile operators Telekom Serbia, VIP Mobile Serbia, Telenor Serbia, m:tel Montenegro